News
1486 news releases found, showing page 87 of 124
-
15 Apr 2013
Siemens at Traffex 2013
Siemens is again at the forefront of Traffex 2013, the 26th edition of the biennial traffic engineering, road safety and highways maintenance exhibition held at the National Exhibition Centre, Birmingham, UK (16-18 April 2013) and regarded as the UK’s most important traffic industry event. -
12 Apr 2013
11000 reasons to work with Siemens
Siemens Rail Electrification, part of the Smart Grid Division, met rigorous standards on its way to achieving BS11000 accreditation in April 2013. -
11 Apr 2013
HBS upgrade at Heathrow Terminal 1 completed by Siemens
Siemens Logistic and Airport Solutions has successfully delivered all 14 phases of the Baggage and Controls System installation as part of the Hold Baggage Screening (HBS) upgrade at Heathrow Terminal 1. The upgrade to meet with DfT compliance and extend the operational life of the system will provide improved maintainability, operational flexibility and additional baggage handling capacity. -
11 Apr 2013
Siemens and BAM awarded major transmission network framework
A joint venture team comprising the Power Transmission Division of Siemens Transmission and Distribution Ltd and BAM Nuttall Ltd has been awarded one of three delivery Lots by SSE’s electricity transmission network business, Scottish Hydro Electric Transmission PLC (SHE Transmission). -
10 Apr 2013
Siemens opens state-of-the-art BREAM “excellence” service centre in Lincoln
Today, Siemens officially opened its new state-of-the art gas turbine service centre at Teal Park in Lincoln. The new centre was opened by the daughters of the late Robert Feilden, after whom the building is named, together with senior executives from Siemens Service Division, some of whom flew in from all over the world to mark this special occasion. -
08 Apr 2013
The Crystal welcomes its 50,000th visitor
The Crystal - a Sustainable Cities Initiative by Siemens - has attracted its 50,000th visitor to the exhibition since it opened seven months ago. -
08 Apr 2013
Energy Minister praises Siemens investment in new tidal testing and assembly facility
Edward Davey, secretary of state for Energy and Climate Change praised Siemens for its investment in innovative marine technologies at the opening of its new testing and assembly facility in Bristol today. -
05 Apr 2013
UCLH hosts PET MR study day in conjunction with Siemens Healthcare
Study course outlined clinical and research applications of PET MR imaging technology -
05 Apr 2013
Tunbridge Wells Hospital bolsters vascular and interventional services with Artis zee MP
Tunbridge Wells Hospital at Pembury, part of the Maidstone and Tunbridge Wells NHS Trust, has installed an Artis zeeTM Multi-purpose (MP) interventional imaging system from Siemens Healthcare. The system is being used for vascular and interventional work, including stent insertions, joint injections and embolisations. The hospital is benefitting from reference overlay, allowing the precise positioning of stents or interventional devices such as inferior vena cava (IVC) filters. -
05 Apr 2013
Jimmy’s welcomes new MRI system to its Siemens imaging team
St. James’s Institute of Oncology, part of St. James’s University Hospital in Leeds affectionately known as ‘Jimmy’s’, has recently installed a MAGNETOM® Aera 1.5 Tesla MRI system from Siemens Healthcare. -
05 Apr 2013
Siemens Healthcare MR installation delivers diagnostic confidence at Spire Little Aston
Spire Little Aston, of the Spire Healthcare Group, in Sutton Coldfield has installed a MAGNETOM® Aera 1.5T MR system from Siemens Healthcare. The hospital is now using the system, which replaces a previous generation Siemens MAGNETOM Symphony, for a wide range of MR imaging including neurological, orthopaedic, routine abdominal and cardiac services. -
05 Apr 2013
University Hospital Southampton bolsters Imaging Department through partnership with Siemens
University Hospital Southampton NHS Foundation Trust (UHS) has selected Siemens Healthcare to manage a 13-year Imaging Infrastructure Support Service (IISS) partnership. The partnership demonstrates the Trust’s long-term commitment to the Imaging Department in providing excellent levels of patient care using the latest diagnostic equipment. Based on the MES concept, the IISS contract is expected to add additional capacity, allowing the Trust to improve throughput and diagnose and treat increasing numbers of patients.